ZJ50JD System Configuration Table
update:2015-03-18 15:38 Click:times
- brand
- model
- describe
Power part Switch cabinet (including top drive power) 1 set include 3 pcs circuit breaker Saving energy generator control cabinet 1 set Provide by party A, party B assist the installation Rotary drive part The rotary frequency conversion u
introduce
Ø Power part- Switch cabinet (including top drive power) 1 set include 3 pcs circuit breaker
- Saving energy generator control cabinet 1 set Provide by party A, party B assist the installation
- The rotary frequency conversion unit cabinet 1 set
- Break unit 1 enclosed in device cabinet
- Break resistance 1
- Bit feed frequency conversion device 1 set
- Break unit enclosed in device
- Break resistance 1
- Driller operation instrument 1 set NOT include driller cabin and auxiliary power part
- Eddy brake control cabinet 1 Provide by party A, party B assist the installation
- MCC power distribution cabinet 2
- Soft-starter cabinet 2
- Electrical control room ( include 2 pcs air-conditioner) 1
- Rotary table encoder 1
- Outside cable and cable connector 1 set Party b is responsible for providing only cable within the specified range
上一篇:没有了
more