Your location:home > Product > Drilling Rig SCR System >

ZJ50JD System Configuration Table

update:2015-03-18 15:38      Click:times
  • brand   
  • model   
  • describe

    Power part Switch cabinet (including top drive power) 1 set include 3 pcs circuit breaker Saving energy generator control cabinet 1 set Provide by party A, party B assist the installation Rotary drive part The rotary frequency conversion u

introduce
Ø  Power part
  1. Switch cabinet (including top drive power)        1 set         include 3 pcs circuit breaker
  2. Saving energy generator control cabinet          1 set         Provide by party A, party B assist the installation
Ø  Rotary drive part
  1. The rotary frequency conversion unit cabinet      1 set
  2. Break unit                                  1            enclosed in device cabinet
  3. Break resistance                             1
Ø  Auto-rig123.net' target='_blank'>drilling part
  1. Bit feed frequency conversion device            1 set
  2. Break unit                                  enclosed in device
  3. Break resistance                             1           
Ø  Driller operation part
  1. Driller operation instrument                   1 set          NOT include driller cabin and auxiliary power part
Ø  Electromagnetic eddy brake parts (Provide by Party A)
  1. Eddy brake control cabinet                    1             Provide by party A, party B assist the installation
Ø  Power distribution and MCC    
  1. MCC power distribution cabinet                2
  2. Soft-starter cabinet                          2
Ø  Others
  1. Electrical control room ( include 2 pcs air-conditioner)        1
  2. Rotary table encoder                                  1
  3. Outside cable and cable connector                       1 set           Party b is responsible for providing only cable within the specified range 

上一篇:没有了

下一篇:Dc speed regulation drive drilling rig

more